This is a complete rolling chassis going to Costa Rica
That's real far away boys and girls. Had to build big sturdy box. $100.00 worth of wood.
2) then add the decking |
8) front and back added |
3) build the front bridge to hold frame |
1) bottom side gets nailed first |
9) just a little room up front |
10) no extra room in back |
4) another shot of bridge, the sun was strong |
5) rear supports started had to run to store, ran out of 3" screws |
8) center support added |
13) hope everyone who lifts this uses the long forks. It's long and heavy ! |
11) double checked and then parts loaded in |
6) time for the sides |
12) time to close it up double check-where's my cat? |